Tuesday, October 6, 2009

VSMS Production Launch Progress Summary

  • Features/services ready
    • Call detail records (CDR) statistics collection
      • Interim CDR translation guide 100%
      • Final CDR translation guide 80%
        • Vendor digit translation 0%
        • Connection path digit translation 0%
      • Software development 30% (hh)
      • Aggregation switch to VSMS network connectivity 100%
      • MCP server farm to VSMS network connectivity 80% (sm + ck)
      • VSMS to CDR-server network connectivity 0% (?)
      • Auto FTP upload from VSMS to CDR server 80% (wk)
      • End-to-end testing 0% (?)
    • Realtime channel subscription
      • Interim VSMS software development 90% (vendor)
      • Final VSMS software development
        • Error handling 70%
        • Troubleshooting tools
          • TL1 command logs 0%
          • SNMP get/set logs 0%
        • Administrative features 70%
          • Read-only account login 0%
        • Look and feel
          • CLI 50%
          • GUI 70%
      • Five MCP TL1 command regression testing 90% (wk)
      • Full TL1 command regression testing 30%
      • GUI regression testing 20% (wk)
    • Video Subscription Management System (VSMS) active/standby failure protection
      • EMC AutoStart/Replistor setup 80% (vendor)
      • Production failover testing 50% (vendor)
    • Pre-box video subscription management 0%
  • Operation, administration, maintenance and provisioning (OAM&P) ready
    • Pre-provisioning
      • Channel pre-provisioning 100%
      • Product pre-provisioning 100%
      • CAC profile pre-provisioning 100%
    • Bill and order provisioning
      • Subscriber line provisioning flow 100%
      • Subscriber CAC profile provisioning flow 80% (?)
      • Product provisioning flow 100%
      • QA testing
        • QA site setup 100%
        • QA first regression test 100%
        • QA issue resolution 70% (kv + wk)
        • QA final regression test 0% (QA team)
    • VSMS access for operation
      • Network connectivity
        • IMC network 100%
        • NM network 80% (cc)
      • Remote desktop 100%
      • FTP server 100%
      • VSMS CLI telnet 100%
      • OS telnet 0%
    • Alarm notification
      • EMC AutoStart SNMP trap setup 0% (vendor + kl)
      • VSMS HP server alarm/polling setup 0% (vendor + kl)
    • Server time synchronization
      • NTP setup 0%
    • VSMS database backup/restore solution 50% (vendor)
    • VSMS OS backup/restore solution 0% (vendor)
    • Vendors remote access
      • Temporary remote desktop solution 100%
      • Production remote desktop solution 0%
  • Handover documentation ready
    • VSMS commissioning guide 0% (wk)
    • Handover manual 10% (wk)
    • Handover training ppt 30% (wk)
    • VSMS installation guide 100%
    • EMC AutoStart/Replicstor guide 100%
    • VSMS TL1 command guide 100%
    • VSMS GUI usage guide 100%
Bold red: Urgent for production launch

2 comments:

  1. 終於喺你個blog 見到的唔係回顧唔係回想唔係發脾4 ... 係正正經經的工作計報告呀~!!!

    大讚~~~

    ReplyDelete
  2. 哈哈, copy左哩個blog落個word到然後比左ar super, 佢頭先即刻係咁睇 :P 哈哈~ 開心

    ReplyDelete